Exhaust gas self-monitoring program

Time :2018-12-08
Automatic monitoring requirements for exhaust gas pollutants: Calibration and maintenance of automatic monitoring equipment in accordance with the Technical Specifications for Continuous

    Exhaust gas self-monitoring program

   1.Waste gas and wastewater monitoring program

Table 1 Self-monitoring plan

Serial number            Pollution source categoryDrain port number 
Drain port nameMonitoring content (1)Contaminant nameMonitoring facilityAutomatic monitoring of networkingAutomatic monitoring instrument nameAutomatic monitoring facility installation locationsAutomatically monitor whether the facility meets the management requirements for installation, operation, maintenance, etc.Manual monitoring sampling method and number (2)Manual monitoring frequency (3)anual measurement method (4)Other information
1
DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal arsenicmanual



Mixed sampling at least 3 mixed samples1 time / seasonWater quality - Determination of total arsenic - Diethyldithiocarbamate silver spectrophotometric method GB 7485-87
2     

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal mercurymanual



Mixed sampling at least 3 mixed samples1 time / seasonWater quality Determination of total mercury Cold atomic absorption spectrophotometry HJ 597-2011 Replaces GB 7468-87 1 time / quarter
3

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal leadmanual



Mixed sampling at least 3 mixed samples1 time / seasonWater quality - Determination of copper, zinc, lead and cadmium Atomic absorption spectrophotometric method GB 7475-87
4

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowTotal cadmmanual



Mixed sampling at least 3 mixed samples1 time / season1 time / seasonWater quality - Determination of copper, zinc, lead and cadmium Atomic absorption spectrophotometric method GB 7475-87
5

DW001
pH, total cadmium, total lead, total mercury, total arsenic, flowpHmanual



Mixed sampling at least 3 mixed samples1 time / season1 time / season
Water quality Determination of pH value Glass electrode method GB/T 6920-86

6

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentMercury and its compoundsmanual



Non-continuous sampling at least 31 time / season1 time / seasonFixed source pollution - Determination of mercury - Cold atomic absorption spectrophotometric method (provisional) HJ 543-2009
7

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentSmokeautomaticYesSCS-900PM soot automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursBoiler dust test method GB 5468-91 instead of GB 5468-85
8

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentNitrogen oxidesautomatic
SCS-900 flue gas automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursFixed pollution source exhaust gas Determination of nitrogen oxides Constant potential electrolysis method HJ 693-2014
9

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentSulfur dioxideautomaticYesSCS-900 flue gas automatic monitorMixed flueYesNon-continuous sampling at least 3Online instrument failure 6 hoursDetermination of sulfur dioxide in fixed pollution source exhaust gas. Constant potential electrolysis method HJ/T 57-2000
10

DA001
Flue gas volume, flue gas temperature, flue gas pressure, oxygen contentRingman blackmanualYes


Non-continuous sampling at least 31 time / seasonDetermination of blackness of flue gas from fixed pollution sources. Lingeman smoke blackness map method HJ/T 398-2007
11

Factory boundary
otal suspended particulate matter (aerodynamic equivalent diameter of 100 μm or less)otal suspended particulate matter (aerodynamic equivalent diameter of 100 μm or less)manual



Non-continuous sampling at least 31 time / seasonWeighing method


2.evalsuation criteria for wastewater monitoring results (Schedule 2)

2 Wastewater pollutant discharge implementation standard table

Serial numberDrain port numberDrain port nameType of pollutantNational or local pollutant discharge standards (1)
nameConcentration limit (mg/L)other information
1
DW001
Total arsenicComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.5

2
DW001
Total cadmComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.1

3
DW001
Total mercuryComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20070.01

4
DW001
PHComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20076-9

5
DW001
Total leadComprehensive discharge standard for water pollutants in Haihe River Basin of Shandong Province DB37/675-20071.0


3.evalsuation criteria for exhaust gas monitoring results (Schedule 3)

Table 3 Exhaust pollutant discharge implementation standard table

Serial numberDrain port numberDrain port nameType of pollutantNational or local pollutant discharge standards (1)other information
name
oncentration limit (mg/Nm3)
3
DA001
Nitrogen oxides"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 46100

4
DA001
Sulfur dioxide"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 4635

5
DA001
Smoke"Shandong Province Thermal Power Plant Air Pollutant Emission Standard" Ultra Low Emission No. 2 Amendment Single Lu Quality Supervision Standard [2016] No. 4610

四 、Factory boundary noise monitoring program

1 、Factory boundary noise monitoring content

Table 4 Noise monitoring at the boundary of the plant

Point layout          

Monitoring project          

Frequency of monitoring             

Monitoring method and   in accordance with

         

Four borders from east to west and north and south of the factory    

Leq        

Once a season             

"Environmental Noise Emission Standards for Industrial Enterprises' Boundaries"

GB12348-2008
         

2 、Factory boundary noise evalsuation standard

The noise at the boundary of the plant implements the Class 3 standard of GB12348-2008 "Environmental Noise Emission Standard for Industrial Enterprises Boundary", with 昼: 65dB(A) and 55dB(A) at night.


五 、Self-monitoring requirements

(1) Automatic monitoring quality assurance

1. Personnel requirements: Persons with more than two training certificates for the effectiveness of the automatic monitoring data of pollution sources issued by the provincial environmental protection authorities.

2. Automatic monitoring requirements for exhaust gas pollutants: Calibration and maintenance of automatic monitoring equipment in accordance with the Technical Specifications for Continuous Monitoring of Flue Gas Emissions from Fixed Sources (Trial) (HJ/T75-2007).

3. Recording requirements: The operation and maintenance records of the automatic monitoring equipment, and the contents of all kinds of original records should be complete and signed by relevant personnel for three years.

(2) Entrusted monitoring
1. Entrusted by the qualified social inspection (supervision) testing agency or the environmental monitoring agency of the environmental protection department to conduct manual self-monitoring on its behalf, and entrusted monitoring must sign an agreement.
2. The environmental monitoring agency of the environmental protection department that undertakes the supervisory monitoring task shall not undertake the self-monitoring entrusted business of the supervised enterprise.

六 、Self-monitoring information

(1) Method of publication
1. The enterprise shall promptly report the self-monitoring information to the municipal environmental protection department in accordance with the requirements, and announce the self-monitoring information to the public on the website of the municipal environmental protection department.
2. The company publicly monitors the information through the external website of Gushen Biotechnology Group Co., Ltd.

(2) Announcement content

Company name          

Gushen Biotechnology Group Co., Ltd.  

legal representative                

Zhang Ween                

Production and operation site address            

Middle section of Caiyuan Road, Lingxian Economic Development Zone            

Postal code (1)            

253500                

Industry category              

Bean products manufacturing              

Whether to put into production (2)                

YES               

Production date (3)             

2007-01-01              



Production and operation center center longitude (4)            

116°54′41′′              

Production and operation site center latitude (5)                

37°36′9′′       

Organization Code

             


Unified social credit code             

91371421723850818U                

Technical director         

Zhao Guozhu            

Contact number                

0534-8295258                

Automatic monitoring manufacturer              

Beijing Xuedilong Technology Co., Ltd.             

Commissioned monitoring agency         

                 

Shandong PerryEnvironmental Protection Monitoring Co., Ltd.                        


              

1. Self-monitoring program
2. Self-monitoring projects and results: all monitoring points, monitoring time, pollutant types and concentrations, standard limits, compliance standards, excess standards, pollutant discharge methods and emission destinations
3. Reasons for not conducting self-monitoring;
4. Annual report on pollution source monitoring.

(3) Announcement time limit

1. The basic information of the enterprise shall be announced together with the monitoring data. If the basic information and self-monitoring plan are adjusted and changed, the latest contents shall be announced within five days after the change;

2. Manual monitoring data shall be published after each report is issued;

3. The automatic monitoring data should announce the monitoring results in real time, and the automatic monitoring equipment for exhaust gas is the average value per hour;

4. Announce the annual report of self-monitoring last year before the end of January each year.



Next : End